Introduce how to ensure the stability of mechanical operation when installing a cold heading machine
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-12-10 15:45
- Views:
(Summary description)1. In mechanical lifting, two cables with a diameter greater than 25 should be used for lifting. The cold heading machine is a special equipment mainly used for mass production of fasteners such as nuts and bolts. According to the theory of metal plastic deformation, the bolt cold heading machine applies a certain pressure to the metal blank at room temperature to cause plastic deformation in the mold cavity and form it according to the specified shape and size. A pair of bevel gears are installed on one end of the crankshaft for standard parts machinery, a cam device is installed on the driven bevel gear shaft, and a scissors slider is installed vertically on the roller shaft of the driven roller of the cam device. The utility model overcomes the shortcomings of the prior art, and the running friction coefficient and impact force between the various parts of the feeding and cutting mechanism are small, so that the equipment runs smoothly, the running noise is effectively reduced, and the product quality and productivity are greatly improved. First, open the operating door cover of the machine and the upper cover behind the main sliding platform. The wire rope should be hung on the four corner booms of the machine platform. The angle of the lugs should not exceed 60 degrees. When lifting, it must be noted that the lifting lugs should not collide with the mechanical parts and the casing. 2. The second step. During installation, attention must be paid to the level of the unit in the front and rear and left directions to ensure the stability of mechanical operation. 3. The cold heading machine is equipped with a pneumatic clutch brake. Before the mechanical air pressure three-point combination, the air pressure storage container should be set up. The two containers can be shared or used separately. For specifications, please refer to the air consumption table of the SR clutch inch motor school bus. 4. The mechanical power distribution and installation cables should not be smaller than the main switch cable on the mechanical control box. At the same time, the motor and the electrical control box must be grounded separately to avoid damage to the machine and personnel when leakage occurs. 5. Lubricating oil or pressure oil should be added before mechanical operation. The lubrication system should explain the volume and viscosity index of the oil. 6. Before starting up, check whether the wire connector is loose and whether the screws of each machine are loose. After the machine has been running for a period of time, recheck whether the screws of each part are loose and whether the oil circuit is unblocked. Chapter VII. To start the machine, first start the lubrication pump. The blue indicator light must be turned on to indicate that the lubrication pump is operating normally, and then the main motor is started. At this time, the air pressure needs to reach 5.5-6.0kg/c. First, move the machine in inches to check whether the machine runs smoothly, and then check whether the stroke is normal. In order to check whether it is normal, the main sliding platform must be at the rear when the machine is stopped for single stroke and general operation. Otherwise, the cam angle position of the electrical appliance controlled by the parking space must be adjusted, which needs to be adjusted due to different speeds. In inch operation, the interval time per inch is greater than 2 seconds, so that the clutch will not be abnormally worn. When the machine is equipped with a gear shifting device, the machine tries to work at a low speed to reduce the sliding wear of the clutch when it is running at high speed.
Introduce how to ensure the stability of mechanical operation when installing a cold heading machine
(Summary description)1. In mechanical lifting, two cables with a diameter greater than 25 should be used for lifting. The cold heading machine is a special equipment mainly used for mass production of fasteners such as nuts and bolts. According to the theory of metal plastic deformation, the bolt cold heading machine applies a certain pressure to the metal blank at room temperature to cause plastic deformation in the mold cavity and form it according to the specified shape and size. A pair of bevel gears are installed on one end of the crankshaft for standard parts machinery, a cam device is installed on the driven bevel gear shaft, and a scissors slider is installed vertically on the roller shaft of the driven roller of the cam device. The utility model overcomes the shortcomings of the prior art, and the running friction coefficient and impact force between the various parts of the feeding and cutting mechanism are small, so that the equipment runs smoothly, the running noise is effectively reduced, and the product quality and productivity are greatly improved. First, open the operating door cover of the machine and the upper cover behind the main sliding platform. The wire rope should be hung on the four corner booms of the machine platform. The angle of the lugs should not exceed 60 degrees. When lifting, it must be noted that the lifting lugs should not collide with the mechanical parts and the casing. 2. The second step. During installation, attention must be paid to the level of the unit in the front and rear and left directions to ensure the stability of mechanical operation. 3. The cold heading machine is equipped with a pneumatic clutch brake. Before the mechanical air pressure three-point combination, the air pressure storage container should be set up. The two containers can be shared or used separately. For specifications, please refer to the air consumption table of the SR clutch inch motor school bus. 4. The mechanical power distribution and installation cables should not be smaller than the main switch cable on the mechanical control box. At the same time, the motor and the electrical control box must be grounded separately to avoid damage to the machine and personnel when leakage occurs. 5. Lubricating oil or pressure oil should be added before mechanical operation. The lubrication system should explain the volume and viscosity index of the oil. 6. Before starting up, check whether the wire connector is loose and whether the screws of each machine are loose. After the machine has been running for a period of time, recheck whether the screws of each part are loose and whether the oil circuit is unblocked. Chapter VII. To start the machine, first start the lubrication pump. The blue indicator light must be turned on to indicate that the lubrication pump is operating normally, and then the main motor is started. At this time, the air pressure needs to reach 5.5-6.0kg/c. First, move the machine in inches to check whether the machine runs smoothly, and then check whether the stroke is normal. In order to check whether it is normal, the main sliding platform must be at the rear when the machine is stopped for single stroke and general operation. Otherwise, the cam angle position of the electrical appliance controlled by the parking space must be adjusted, which needs to be adjusted due to different speeds. In inch operation, the interval time per inch is greater than 2 seconds, so that the clutch will not be abnormally worn. When the machine is equipped with a gear shifting device, the machine tries to work at a low speed to reduce the sliding wear of the clutch when it is running at high speed.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-12-10 15:45
- Views:
Related Information

Whether the standard parts of the bending pipe movement mechanism are loose

These demands drive the use of all-electric pipe bending technology bolt cold heading machines

Introduce how to ensure the stability of mechanical operation when installing a cold heading machine

The influence of material modification of cold heading machine on product quality

TEL:+86 757-85608889
M/P:13928630328
E-mail:hexing@fs-hexing.com
ZIP:528200
Add:Lishui Dachong Industrial Zone, Nanhai District, Foshan City
Guestbook
Copyright: HeXing Screw Machinery 粤ICP备13006378号 www.300.cn